Public Procurement Act · Chapter 2
§ 88. Issue of technical specifications
Chapter 2 · Procurement Procedure · Division 2: Fundamentals of Procurement Procedure · Subdivision 3: Technical Specifications
(1) Where there is no technical regulation in the respective field, the contracting authority or entity issues technical specifications as a description of the characteristics of use or as functional requirements for the subject matter of the public contract, which may include ecofriendliness requirements and must be sufficiently precise so that the tenderer could identify the subject matter of the public contract and the contract could be awarded, or using the method mentioned in subsection 2 of this section or by combining the two.
(2) When issuing technical specifications, the contracting authority or entity may rely on the following in the following order:
1) a European standard transposed as an Estonian standard;
2) a European standard;
3) a European technical approval, which has been granted by an approval body designated by a Member State of the European Union and which certifies that, from the technical point of view, the product is suitable for the prescribed purpose in terms of its characteristics, which correspond to the main requirements established for works, as well as in terms of its features and the prescribed conditions of application or use;
4) a common technical specification, which has been established in accordance with the rules recognised by a Member State of the European Union and published in the Official Journal of the European Union;
5) an international standard;
6) a technical reference system established by a European standardisation body;
7) the original Estonian standard, Estonian technical approval or Estonian technical specifications relating to the design, calculation and execution of works or use of products.
(3) Every reference that the contracting authority or entity makes in the technical specifications to any basis mentioned in subsection 2 of this section is accompanied by the words ‘or equivalent.’
(4) When issuing technical specifications on the ground mentioned in subsection 1 of this section, the contracting authority or entity may refer to any basis mentioned in subsection 2 as the performance requirements mentioned in subsection 1 or as a means of ensuring conformity with functional requirements.
(5) The contracting authority or entity may require that the tenderer provide a test report from a conformity assessment body or a certificate issued by such a body as means of proof of conformity with requirements or criteria set out in the technical specifications, the award criteria or the contract performance conditions.
(6) Technical specifications do not refer to a specific source, process, trade mark, patent, type, origin or type of production with the effect of favouring or eliminating certain undertakings or certain products. Such reference is permitted, on an exceptional basis, where a sufficiently precise and intelligible description of the subject matter of the public contract in accordance with subsections 1 and 2 of this section is not possible. Such reference is accompanied by the words ‘or equivalent.’
(7) Technical specifications must ensure that the conditions for the submission of a tender are equal for all tenderers and must not have the effect of creating unjustified obstacles to the opening up of public procurement to competition.
(8) When creating technical specifications for the subject matter of a public contract to be used by natural persons, consideration must be given to potential needs, with regard to that subjec-matter, of users with disabilities – or the technical specifications must be created such that everyone would be able to use the subject matter of the contract, except in duly justified situations. Where mandatory accessibility requirements have been provided by a legislative instrument of the European Union, the contracting authority or entity includes in the technical specifications a reference to the relevant instrument.
Amended by RT I, 05.05.2022, 2 (in force from 1 June 2022)
On this site
Want your procurement documents checked before publication? We will show you how Procurelex Verifika does it.
Request a demoGeneral information on the Public Procurement Act in force. Not legal advice.